• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    The project owner is an internationally renowned kitchen equipment manufacturing group. The facility’s metal roofs in high-temperature conditions create complex wiring, making traditional centralized monitoring insufficient for module-level coverage. Additionally, the system must provide rapid shutdown capability to handle emergency fire scenarios, posing significant challenges for PV safety and operational precision.

    The client expects the PV system to remain safe and reliable under high-temperature, metal-roof conditions, with module-level monitoring, rapid shutdown, and intelligent O&M to reduce manual inspections, while ensuring continuous production and stable power supply.

    1.Module-level rapid shutdown completes safe power-off within 30 seconds, improving overall safety level by approximately 80%
    2.Real-time monitoring of voltage, current, and power increases fault location efficiency by about 70%
    3.Intelligent alerts reduce manual inspections, improving anomaly detection and handling efficiency by around 50%

Guangdong FLK Project

SYSTEM

V2.5 Module-Master™ Solution MR

  • 649KW
    INSTALLED CAPACITY
  • 1600
    INSTALLATION QUANTITY
  • APT-MC-MR-T2
    PRODUCT
  • China
    LOCATION
  • Manufacturing
    INDUSTRY
  • Factory
    INSTALLATION TYPE