• 01.

    Project Overview
  • 02.

    Customer Needs
  • 03.

    Installation Effect

    This project involves a solar PV installation at an urban park in Malaysia, with panels distributed across building rooftops and open areas. The system needs to balance aesthetic integration with energy efficiency, while coping with tropical high temperatures and heavy rainfall, placing high demands on system stability, durability, and remote monitoring capabilities.

    The client expects the solar PV system to maintain the park’s aesthetic appeal while delivering efficient power generation and energy management. The equipment must be highly durable, operate reliably, and feature remote monitoring and intelligent management capabilities to reduce operational costs and ensure long-term dependable performance.

    1. Remote monitoring covers 99.99% of the park, with real-time data collection and alerts effectively reducing operational costs
    2. Solar power meets approximately 50% of the park's daily electricity demand, significantly reducing carbon emissions
    3.System durability improved, with critical equipment maintaining 99% stability under high-temperature and high-humidity conditions
    4.Aesthetically installed, harmonizing with the park landscape without affecting public activity areas

Malaysia NMP Project

SYSTEM

V2.5 Module-Master™ Solution MR

  • 350KWp
    INSTALLED CAPACITY
  • 510
    INSTALLATION QUANTITY
  • APT-MC-MR-T2
    PRODUCT
  • Malaysia
    LOCATION
  • Park
    INDUSTRY
  • Municipal
    INSTALLATION TYPE

Case Gallery

CONTACT US

  • Business cooperation

  • Technical services

  • Join us

  • *
  • *
  • *
  • *
  • *
  • *
  • *