Installation EffectThis project is a distributed rooftop PV installation for an office building, designed to support daily office operations. With a diversified rooftop structure and fluctuating electricity loads during working hours, the system requires higher levels of safety, controllability, and generation stability. An advanced system solution was adopted to enhance overall performance and long-term operational value.
The client focuses on the practicality and economic benefits of the PV system in an office setting, seeking to improve energy utilization through intelligent management, achieve effective cost control, reduce manual maintenance efforts, and ensure long-term safe and stable operation.
1.Safety improved by 80% with module-level control and rapid shutdown
2.O&M efficiency increased by 40% via intelligent monitoring
3.Annual generation supplies about 60% of electricity demand
V2.5 Module-Master™ Solution R
Installation by Workers
Product Detail View
Project Aerial View
Installation by Workers
Product Detail View
Project Aerial View
8 Floor, Building 2,36 Zijing Street, Wuzhong District,Suzhou City, China
8 Floor, Building 2,36 Zijing Street, Wuzhong District,Suzhou City, China
© AdvanSol 2023 苏ICP备2023043017号-1 Designed by Sara, Nic, Zoe, Ivy
Back to Top
© AdvanSol 2023
苏ICP备2023043017号-1
Designed by Sara, Nic, Zoe, Ivy